Noise protection measures on existing ÖBB lines
Funding of costs for the planning and construction of railway-side noise protection measures as well as the replacement of acoustical windows, doors, and vents in residential buildings along ÖBB existing lines in Tyrol. Applications can be submitted within four years after municipal notification; valid since 01.01.2004, unlimited.
Discover your potential with AI support
- Find out if this grant matches your project
- Develop your application together with AI
- Get matched with many more suitable grants
Grant criteria
Funding objective
Funding is provided for costs associated with the construction of railway-side noise protection walls and embankments, including planning services, acquisition of third-party land, as well as compensation for property-side measures (replacement of windows and doors, installation of soundproof ventilation) and necessary acoustic studies to reduce rail traffic noise on existing ÖBB routes in Tyrol.
Eligible expenses
- Planning services
- Construction costs for railway-side noise barriers
- Replacement of windows and doors
- Installation of soundproof ventilation systems
- Acoustic investigations
Non-eligible expenses
- Measures in rooms without residential or sleeping purposes (e.g., hallways, kitchens without residential use)
- Basements and attics without residential designation
- Noise protection measures already funded
Eligible to apply
- Individuals
Funding requirements
- Exceeding the emission limit values at the building
- Residential or sleeping purpose of the affected rooms
- Building permit before 1 January 1993
- No prior use of public funds for noise protection measures
- Application within four years after notification by the municipality
Documents required for application
- Occupancy permit or building permit notice
- Construction plans with room designation
- Details on windows, doors, and soundproof ventilators
- Declaration of non-utilization of public funds
- Current land register excerpt
Description
In Tyrol, there is an ongoing opportunity to relieve private residential buildings along existing ÖBB railway lines through a subsidy for noise protection measures on both the railway side and the building side. Funding is provided for planning services and construction costs for noise barriers and embankments as well as for the building side: the replacement of acoustically rated windows and doors and the installation of soundproof ventilation units. A prerequisite is the exceedance of immission limit values in living or sleeping rooms in buildings with a building permit issued before January 1, 1993. Applications can be submitted within four years after municipal notification, provided that no public funds have yet been used for noise protection measures. The eligible project duration is up to 72 months, and the funding rate varies depending on the measure between 50% and 100% of the eligible costs.
For an application, a final inspection or building permit decision, construction plans with room designation, detailed information on windows, doors, and ventilation units, a declaration of non-utilization of public funds, as well as a current land register excerpt are required. ÖBB-Infrastruktur Bau AG reviews the eligibility for contribution within six months of submission, calculates the cost contribution based on the valid reference values, and confirms the funding. After timely implementation and submission of invoices, the payment is made. Through the combination of railway-side protective walls and building-side sound insulation, residents can achieve a noticeable noise reduction and sustainably improve their quality of living.