Grant

Salzburg Hydropower Consultant

Grant for a one-time consulting service to improve the efficiency of existing small hydropower plants in the state of Salzburg. Applications can be submitted at any time.

Energy Efficiency & Renewable Energies Environmental/Nature Protection Climate Action Consulting

Discover your potential with AI support

  • Find out if this grant matches your project
  • Develop your application together with AI
  • Get matched with many more suitable grants

Grant criteria

Application Deadline:
01.01.2014
Application level: Simple
Region: Salzburg
Funding amount: max. € 1,000 per consultation
Funding rate: 67% - 100%

Funding objective

The objective of the funding is to sustainably increase the efficiency and electricity generation of existing small hydropower plants (<10 MW) in the state of Salzburg through a two-stage consulting model involving modernization, revitalization, and technical optimization.

Eligible expenses

  • Preliminary analysis of the hydropower plant (Stage 1)
  • Detailed analysis by external hydropower consultant (Stage 2)
  • Comprehensive consulting for pico power plants by the Renewable Energy Salzburg working group

Eligible to apply

  • Individuals
  • Companies

Funding requirements

  • Location of the hydropower plant in the state of Salzburg
  • Operator of a small hydropower plant (<10 MW)
  • Request for the consultation voucher after positive preliminary analysis
  • Consultation by external experts
  • Only one consultation voucher per power plant is possible
  • Show more

Documents required for application

  1. Fully completed application form
  2. Proof of personal and plant-related authorizations for operating the facility
  3. Excerpt from the commercial register (for legal entities)

Evaluation criteria

  • Efficiency improvement potential >15% for stage 1
  • Completeness of application documents
  • Compliance with the funding guidelines of the State of Salzburg

Description

The Salzburg Small Hydropower Consultant program is aimed at operators of small hydropower plants (<10 MW) in the state of Salzburg. The goal is to sustainably increase electricity generation through modernization, revitalization, and technical optimization. For this purpose, a one-time, subsidized consulting service is offered in a two-stage model: In stage 1, a preliminary analysis is conducted by the Water Department, and if an efficiency potential of over 15% is positively assessed, a voucher for detailed hydropower consulting is issued. In stage 2, external experts analyze the technical, hydrological, and ecological conditions on site and prepare a final report with recommendations for action. For pico power plants (up to approx. 30 kW), the Renewable Energy Association Salzburg assumes the complete consulting service.

The funding is provided through a grant of up to 1,000 euros per consulting service and covers 67% to 100% of eligible expenses. A personal contribution of up to 500 euros (or 200 euros for pico plants), or at least one-third of the consulting costs, must be made. Requirements, in addition to the location in Salzburg and proof of operating rights, include the submission of a fully completed application form before the start of the consultation. The processing is handled by the General Water Management Department of the Office of the Salzburg State Government; applications can be submitted continuously. This offer provides practical support to sustainably increase the efficiency of small hydropower plants while simultaneously contributing to climate and environmental protection.

Start application →

Ready to secure your funding?

Register now and let our AI guide you through the application process – from eligibility check to finished application.