Grant

District heating connection ≥ 100 kW

Funding for connection to a highly efficient local/district heating system with a capacity of 100 kW or more in Austria. Applications accepted from 01.03.2024 to 31.12.2050.

Discover your potential with AI support

  • Find out if this grant matches your project
  • Develop your application together with AI
  • Get matched with many more suitable grants

Grant criteria

Application Deadline:
01.03.2024
Application level: Advanced
Region: Austria (nationwide)
Company size: Small and medium-sized enterprises (SMEs)
Funding amount: €100 per kW for the first 500 kW, €70 per kW for each additional kW

Funding objective

Funding is provided for all system components within the property boundary and owned by the applicant for a connection with a capacity ≥ 100 kW to a highly efficient local/district heating system.

Eligible expenses

  • Transfer station
  • Integration into the heating system
  • Pipes, pumps, valves
  • Storage tanks and boilers
  • Excavation work
  • Show more

Eligible to apply

  • Companies
  • Interest Groups and Other Associations

Funding requirements

  • Connection capacity ≥ 100 kW
  • Application submission before first legally binding order, delivery, or start of construction
  • Report from the credit institution for an investment volume > €500,000

Documents required for application

  1. Report from the credit institution (for investment volume > €500,000)

Description

The funding for district heating connections ≥ 100 kW supports companies, associations, and religious communities in connecting to highly efficient local and district heating systems throughout Austria. For a connection capacity of at least 100 kW, all system components within the property boundary are eligible for funding – from the transfer station and integration into the heating system to pipes, pumps, valves, storage tanks, and boilers. Excavation work, planning, and installation are also considered eligible expenses. Small and medium-sized enterprises (SMEs) benefit from a flat rate of €100 per kW for the first 500 kW and €70 per kW for each additional kilowatt hour, significantly easing investments in energy efficiency and climate protection.

Applications can be submitted in the period 01.03.2024 to 31.12.2050. Prerequisites for funding are a connection capacity ≥ 100 kW, submission prior to the first legally binding order, delivery, or start of construction, as well as a report from a financial institution for investment volumes exceeding €500,000. The processing is handled by Kommunalkredit Public Consulting GmbH, which acts as an expert in environmental funding. After reviewing the complete documentation, a funding proposal and contract conclusion are organized to ensure timely disbursement. Clear funding criteria and transparent calculations provide planning security and promote a sustainable energy future.

Start application →