Grant

Funding for the near-natural development and protection of water bodies as well as for sustainable water management and the stabilization of the landscape water balance

Funding of waterbody development and water management projects in Brandenburg. Applications can be submitted continuously; requirement: BNR-ZD and authega certificate.

Environmental/Nature Protection Climate Action

Discover your potential with AI support

  • Find out if this grant matches your project
  • Develop your application together with AI
  • Get matched with many more suitable grants

Grant criteria

Application Deadline: Ongoing
Application level: Advanced
Region: Brandenburg
Funding rate: 100%

Funding objective

Funding of projects for the near-natural development and protection of water bodies, as well as for sustainable water management and the stabilization of the landscape water balance under the sponsorship of the State of Brandenburg.

Eligible expenses

  • Planning and feasibility studies
  • Capital waterbody development measures
  • Compensatory and replacement measures
  • Project management and procurement procedure costs

Non-eligible expenses

  • Own contributions
  • Leasing costs
  • Fines and legal costs
  • Interest on debt

Eligible to apply

  • Public Institutions
  • Non-profit Organizations
  • Cooperatives

Funding requirements

  • Sponsorship by the State of Brandenburg or transfer to water and soil associations
  • Submission of documents to the LfU, Department W22
  • BNR-ZD and authega certificate

Documents required for application

  1. ELER/GAK-VV-GewSan or ELER-VV Water Management
  2. Project Description and Plans
  3. Management Plan Evidence
  4. BNR-ZD
  5. Authega Certificate

Evaluation criteria

  • Cost-benefit ratio
  • Quality of water body development
  • Sustainability aspects

Description

Funding for near-natural development and water protection in Brandenburg is aimed at public institutions, non-profit organizations, and cooperatives that implement measures under the sponsorship of the state or through water and soil associations. Eligible for funding are investment projects for water body development, planning and feasibility studies, compensation and replacement measures, as well as project management and procurement costs. The basis is the ELER/GAK administrative regulation (ELER/GAK VV GewSan), effective since August 15, 2025, as well as the ELER-VV Water Management (valid until December 31, 2027). Applications can be submitted digitally at any time via the internet portal (IAP); registration with BNR-ZD and an authega certificate are prerequisites. The funding rate is 100 percent in all cases, with a ceiling within the funding area framework of rural regions. Excluded are in-kind contributions, leasing costs, fines, legal fees, and interest. Project sponsors are required to demonstrate criteria such as cost-benefit ratio, quality of water body development, and sustainability aspects in the proof of use.

The State Office for the Environment (LfU), Department W22, coordinates the technical preliminary review, while the Investment Bank of the State of Brandenburg (ILB) is responsible for approval and disbursement. In addition to public tenders, direct awards or restricted tenders are possible depending on the contract value. All procedures require transparent documentation and adherence to the principles of non-discrimination and transparency. If needed, experts advise on procurement procedures, for example Dr. Peter Braun from Dentons Europe LLP. The program thus creates optimal framework conditions for water protection and sustainable water management in the State of Brandenburg.

Start application →

Ready to secure your funding?

Register now and let our AI guide you through the application process – from eligibility check to finished application.