Power Generation in Island Mode Based on Renewable Energy Sources

Funding of electricity generation systems for self-supply in off-grid island locations (e.g., mountain huts). Applications possible continuously from 01.03.2024.

Energy Efficiency & Renewable Energies Climate Action Environmental/Nature Protection

Discover your potential with AI support

  • Find out if this grant matches your project
  • Develop your application together with AI
  • Get matched with many more suitable grants

Grant criteria

Application Deadline:
01.03.2024
Application level: Advanced
Region: Austria (nationwide)

Funding objective

Funding is provided for power generation systems based on renewable energy sources for self-supply in off-grid island locations without network access options (e.g., mountain huts).

Eligible expenses

  • Acquisition of the system
  • Planning costs
  • Installation costs

Eligible to apply

  • Companies
  • Interest Groups and Other Associations
  • Non-profit Organizations

Funding requirements

  • Project location on an island without grid connection possibility
  • Application submission before the first legally binding order, delivery, or start of construction
  • Proof of renewable energy sources as the basis of electricity generation

Documents required for application

  1. Technical description
  2. Yield and consumption forecast
  3. Offers and cost estimates for essential plant components
  4. Approvals for construction and operation of the plant
  5. Report from the credit institution for investment volume > €500,000

Description

The funding program “Electricity Generation in Island Mode Based on Renewable Energy Sources” supports companies, entrepreneurial organizations, associations, and religious institutions throughout Austria in establishing independent power supply systems in remote locations without grid access. Investments in photovoltaic, small hydropower, or wind power plants, combined heat and power plants, as well as electrical energy storage systems, including associated planning and installation costs, are eligible for funding. A prerequisite is that the project site is located in an island mode without grid connection and that electricity generation is based exclusively on renewable energy sources. The application must be submitted before the initial order, delivery, or start of construction; funding can commence continuously from March 1, 2024. For the application, a technical description, yield and consumption forecast, cost estimates, construction and operating permits, as well as – for investment volumes exceeding €500,000 – a report from the credit institution are required.

The aim of the initiative is to improve energy efficiency, reduce greenhouse gas emissions, and strengthen climate protection in remote regions. A non-repayable grant cushions higher investment costs for environmentally friendly technologies. The processing is carried out by Kommunalkredit Public Consulting GmbH on behalf of the Federal Ministry of Agriculture, Forestry, Environment and Water Management. Project managers receive a funding contract upon positive evaluation; disbursement takes place after completion and settlement of the measure. Combining this funding with existing regional subsidies, for example in Tyrol, is possible. Further details on the application process and legal framework are provided in the comprehensive information sheet of the Environmental Funding for Domestic Projects.

Start application →