Grant

Grants for Plug-and-Play Photovoltaic Systems for Citizens of the State of Mecklenburg-Western Pomerania

Funding for plug-and-play photovoltaic systems (mini balcony power plants) for tenants in Mecklenburg-Western Pomerania with a subsidy of up to €500 per system. Applications must be submitted after installation; funds are continuously available.

Energy Efficiency & Renewable Energies Climate Action

Discover your potential with AI support

  • Find out if this grant matches your project
  • Develop your application together with AI
  • Get matched with many more suitable grants

Grant criteria

Application Deadline:
31.12.2027
Application level: Advanced
Region: Mecklenburg-Western Pomerania
Funding amount: €500 per system and housing unit

Funding objective

Support for the acquisition and installation of plug-and-play photovoltaic systems (mini balcony power plants) by private individuals in Mecklenburg-Western Pomerania to promote partial supply with renewable energies and climate protection.

Eligible expenses

  • Acquisition of the system
  • Installation of the system

Non-eligible expenses

  • Accessories
  • Conversion kits
  • Own contributions
  • Assistance from third parties
  • Self-construction
  • Show more

Eligible to apply

  • Individuals

Funding requirements

  • Primary residence in Mecklenburg-Vorpommern
  • Tenant in a residential building
  • Purchase date of the system after 07.11.2022
  • Photovoltaic system with 200 W to 800 W connection capacity
  • Notification to grid operator and market master data register completed
  • Show more

Documents required for application

  1. Copy of the invoice for purchase and installation
  2. Photo of the installed system
  3. Copy of the identity card
  4. Copy of the debit card for IBAN verification

Description

The state of Mecklenburg-Western Pomerania supports private individuals with their primary residence in the federal state who purchase and have plug-in photovoltaic systems (so-called mini balcony power plants) installed as tenants in residential buildings. The aim of this measure is to strengthen independent partial supply with renewable energies as well as to support climate protection activities in the private sector. For each system with a connection capacity between 200 W and 800 W, a one-time fixed grant of up to €500 can be awarded. The funding is provided as a non-repayable grant within the framework of an ongoing program and covers acquisition and installation costs, provided these do not exceed the maximum limit.

A prerequisite for a positive decision is the registration of the system with the grid operator and the market master data register, as well as, if applicable, the consent of the landlords or the condominium owners' association. Acquisition and installation must have taken place after November 7, 2022; the system must be held in ownership for at least two years. Economic use or EEG remuneration for fed-in electricity excludes funding. Applications must be submitted in writing to the state funding institute after successful commissioning and must be accompanied by copies of the purchase and installation invoices, a photo of the system, identity card, and EC card proof of the IBAN. As long as budget funds are available, applications will be approved in the order of their complete receipt; the deadline runs until December 31, 2027.